The Aiken press release was incorrect on a number of points

Can now confirm that the train had at least 356 seats not 300 as Aiken claimed, thats 20% more, it could have had 432 seats but I can't confirm it. Can confirm a guard was not required as a MK3PP set was used on a CTC radio line

We can't account for the level crossings since there are only 5 manual IE staffed gates on the entire line to Waterford not 9 as claimed.

Bottom line public was ripped off, Irish Rail did not as is practice provide the train instead they chartered it out