Quote:
Originally Posted by Thomas J Stamp
I was surprised at the DART action, I thought the 10 min timetable was kicked back till much later this year than April.
Strikes in CIE can be over things which we find odd. For example the introduction of the RA double deck fleet caused a strike as they were about 4 ft longer than the R type double deckers. Sticking with tradition.
|
To clarify, there are two Connolly timetables in the pipeline:
1) Recast timetables including 10 minute DART service
2) Post-City Centre re-signalling including Kildare line to Grand Canal Dock
The first was due in January and now is April, while the second isn't due until later in the year.