View Single Post
Unread 21-01-2008, 12:24   #8
shweeney
Regular Poster
 
Join Date: Mar 2006
Posts: 180
Default

whoever is responsible for platform and bridge design in IE has clearly arrived in Ireland from a much warmer drier climate (the Kalahari Desert maybe).

Apart from the lethally slippy tiles, most of the tarmacced platforms suffer terribly from standing water, as do the new bridges in Bray & Greystones (in Greystones they had to come back after the bridge had been up for several months and actually drill holes in the deck and the steps to allow drainage - it hasn't worked)
shweeney is offline   Reply With Quote