![]() |
[15/08/2012]-Delays to outbound Heuston services
10.00 service to Cork delayed 90mins at Newbridge due to loco failure. Other services to Galway and Waterford delayed as a result.
|
11.00 to Cork 90minutes late.
11.10 to Waterford 80minutes late 11.30 to Galway 60minutes late. This.faolire was handled very bady and it should not tale two hours to get a loco from Heuston.to Newbridge. Why was single line operaton.not used |
All times are GMT. The time now is 17:09. |
Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.