PDA

View Full Version : [24.07.2007] Signal Failure between Connolly and Tara


Mark Hennessy
24-07-2007, 08:05
There was a signal failure (allegedly) between these two stations affecting south bound Darts.

I had just got off the 0700 from Maynooth at Pearse with the intention of getting the next southbound Dart.

Needless to say I didnt bother hanging around to see how long the situation would last :rolleyes:

Mark Gleeson
24-07-2007, 08:09
Its not on the IE site but the platform displays where quoting up to 20 minute delays in both directions

Trains where strangely already 5-10 minutes late leaving Blackrock going northbound despite having green signals the whole way