View Full Version : [28/03/2012] - Heuston Services Delayed by 25-45 mins - mechanical fault


Jamie2k9
28-03-2012, 13:23
All outbound services from Heuston operating with 25-50 mins delay due to mechanical fault on a maintenance train

13.00 Hueston-Cork delayed 43 mins - departed Monestevan
13.10 Heuston-Waterford delayed 50 mins - departed Kildare
13.40 Heuston-Limerick delayed 27 mins - departed Sallins

11.30 Cork-Heuston delayed 30 mins - departed Newbridge

Jamie2k9
28-03-2012, 13:50
13.10 to Waterford running 65 mins late @ Cherryville Junction.

Carrage A
28-03-2012, 20:56
A little suprised they kept the 13.10 at Cherryville for 20 mins so not to delay the 13.00 ex Waterford.

2200DMU
28-03-2012, 21:48
A Freight train was heald in Athy until services went back to normal so two passenger trains couldn't cross so IR had no choise but to hold it.

Traincustomer
28-03-2012, 22:28
Could the freight train perhaps have reversed into the branch to the former Tegral factory? The initial part of this is certainly useable and understand such reversals happened in the past. The two passenger trains could then have crossed in Athy. Perhaps there's some technicality or signalling point I'm missing but on the face of it this seems perfectly doable.

Jamie2k9
28-03-2012, 22:46
Train would of being on platform 2, if arrived on platform 1 the service would be to long and would miss the points for acess the siding and as it was coming from Waterford causes problems to.

IR made a good decision and only delayed on service instead of two. if bother crossed there the 13.00 ex Waterford would of being 30 mins late.