View Full Version : Watch Out for Luas - Test running Busáras to The Point


Colm Moore
11-09-2009, 19:16
http://www.luas.ie/page.php?name=Watch_Out_for_LuasWatch Out for Luas

The extension of the Luas Red Line to The Point is entering the final phases of construction. Part of the final phases of construction is testing the new section of the line by running Luas trams along it. Test running of the trams will begin in September and continue over the coming months.

If you are walking, running, cycling or driving in the area you will need to be more careful and look out and listen for trams.

Full details about Testing Times and Dates, Safety and Traffic Movements, are available on www.rpa.ie, click here for more information.

Click here to read or download Frequently Asked Questions about test running of trams. (http://www.luas.ie/ul/www_luas_ie_FAQ's_C1_Tram%20Movements_100909.pdf)

Click here to read or download the Luas Docklands (Busáras to The Point) (Line C1) Safety leaflet. (http://www.luas.ie/ul/Luas%20Docklands%20(Line%20C1)%20Safety%20Leaflet. pdf)

Click here to read or download information on traffic movements close to Luas Docklands (Busáras to The Point) (Line C1) (http://www.luas.ie/ul/Luas%20Docklands%20(Line%20C1)%20Updated%20No%2024 %20Special%20Edition.pdf)

Click here to read or download the latest Luas Docklands (Busáras to The Point) (Line C1) Construction Update (http://www.luas.ie/ul/Luas%20Docklands%20(Line%20C1)%20Construction%20Up date%20No%2024.pdf)

Click here to read more about the Red Line extension, Luas Docklands (Busáras to The Point) (Line C1) (http://www.rpa.ie/en/projects/luas_docklands/construction/Pages/default.aspx)

Mickey H
17-09-2009, 20:20
Is there an opening date for the line yet?

Colm Moore
17-09-2009, 20:23
Likely in December 2009 / January 2010 assuming the testing goes OK.